GEXC2013-0955
13HIS / 00000 / 01653
Record Type
Building/ERS/Admin/Grading Exception
CAP Status
Approved
File Date
10/14/2013
Detailed Description
Today's Date: 10-14-13 I am the (check all that apply): Property Owner: Authorized Agent: Contractor: YES Supervisor: Preparer's Name: Joel Anderson / Dianda Construction, Inc. Preparer's Mailing Address: 1050 Linda Way Preparer's City: Reno Preparer's State: NV Preparer's Zip Code: 89431 Preparer's e-mail Address: janderson@diandaconstruction.com Preparer's Phone Number: 775-398-0123 Owner's Name: Maggie O'Donnell & Josh Floum Owner's Mailing Address: 323 Seymour Lane Owner's City: Mill Valley Owner's State: CA Owner's Zip Code: 94941 Owner's e-mail Address: Owner's Phone Number: Name of Person Supervising or Directing Grading: Guy Meerschaert / B&G Excavation Supervisor's Mailing Address: 7011 National Ave Supervisor's City: Tahoe Vista Supervisor's State: CA Supervisor's Zip Code: 96148 Supervisor's e-mail Address: bngexcavation@gmail.com Supervisor's Phone Number: 530-412-0018 Grading Location/Address: 3328 Edgewater Drive Assessor's Parcel Number (APN): 093-094-041 TRPA Permit or File Number(s): 50365-13 County Name and Permit Number(s): Placer / 0700 If MOU, Attachment B line number: Amount of material to be excavated in Cubic Yards: 0 only back filled Total area of disturbance in square feet: 250-300 during stemwall backfill and compaction Destination of excavated material: N/A Date work is to begin: Date work is to end: Detailed Description Of Grading Work To Be Done: Concrete Footings have been poured for the new residence as of Friday late after noon 10-11-13. Footings were stripped and cleaned up 10-12 and 10-14. Work on forming of stem walls began 10-14. Forming and rebar in the stem walls wil continue until approximately 10-23, with concrete stemw walls being poured on 10-24. Once the stem walls are curedm they will be waterproofed. Once wat4erproofed thn B&G Excavation will backfill the stem walls with gravel and compacted. BMP including Pine needels and waddles will be installed on the hardscape below the new house 10-15 to 10-16. Final BMP's for winterization will be installed upon the upper street level immediately following backfill of the stem walls.
Assigned to
Ethan Casaday

Associations

Parcels
Transactions

No development right transactions associated with this record.

Land Capabilities

No parcel land capability records associated with this record.