GEXC2013-0948

If you have any questions about a permit, call this number (775) 589-5333 or use the TRPA staff directory to find the contact information for the assigned planner.

Basics

GEXC2013-0948
13HIS / 00000 / 01644
Record Type
Building/ERS/Admin/Grading Exception
CAP Status
Approved
File Date
10/14/2013
Detailed Description
Today's Date: October 14, 2013 I am the (check all that apply): Property Owner: YES Authorized Agent: Contractor: Supervisor: Preparer's Name: Kevin M. Agan/Agan Consulting Corporation Preparer's Mailing Address: Post Office Box 9180 Preparer's City: Incline Village Preparer's State: NV Preparer's Zip Code: 89450-9180 Preparer's e-mail Address: kevin@aganconsulting.com Preparer's Phone Number: (775) 832-9300 Owner's Name: Jones 1990 Living Trust Owner's Mailing Address: 756 El Pintado Road Owner's City: Danville Owner's State: CA Owner's Zip Code: 94526 Owner's e-mail Address: Owner's Phone Number: Name of Person Supervising or Directing Grading: Pete Dittli, Project Superintendant Supervisor's Mailing Address: Post Office Box 1902 Supervisor's City: Tahoe City Supervisor's State: CA Supervisor's Zip Code: 96145-1902 Supervisor's e-mail Address: pete@brinkcustomhomes.com Supervisor's Phone Number: (775) 247-6689 Grading Location/Address: 678 Lakeshore Boulevard, Incline Village, NV 89451 Assessor's Parcel Number (APN): 122-193-27 TRPA Permit or File Number(s): County Name and Permit Number(s): Washoe County 12-2153 (MOU) If MOU, Attachment B line number: Amount of material to be excavated in Cubic Yards: 100 Total area of disturbance in square feet: Approximately 5,000 (includes equipment access) Destination of excavated material: No export of material is expected Date work is to begin: Continuous until completion Date work is to end: October 25, 2013 (Excavation Related) Detailed Description Of Grading Work To Be Done:Completion of utility line connections in public street and within project site. Placement of remaining backfill surrounding building foundation to further stabilize site. Continued installation of permanent BMP site improvements and winterization of project site within 12 hours of inclement weather. Continued confinement of disturbed areas with temporary BMP measures to avoid sediment discharge from project site.
Assigned to
Ethan Casaday

Associations

Parcels
Transactions

No development right transactions associated with this record.

Land Capabilities

No parcel land capability records associated with this record.

CAP Documents