GEXC2013-0894

If you have any questions about a permit, call this number (775) 589-5333 or use the TRPA staff directory to find the contact information for the assigned planner.

Basics

GEXC2013-0894
13HIS / 00000 / 01576
Record Type
Building/ERS/Admin/Grading Exception
CAP Status
Approved
File Date
10/10/2013
Detailed Description
Today's Date: 10/09/2013 I am the (check all that apply): Property Owner: Authorized Agent: YES Contractor: Supervisor: Preparer's Name: Lori Shannon Preparer's Mailing Address: Post Office Box 7949 Preparer's City: Tahoe City Preparer's State: CA Preparer's Zip Code: 96145 Preparer's e-mail Address: lori@ooadesign.com Preparer's Phone Number: 530.550.0709 Owner's Name: Alpine Bear Creek, LP Owner's Mailing Address: Post Office Box 7949 Owner's City: Tahoe City Owner's State: CA Owner's Zip Code: 96145 Owner's e-mail Address: bolson@bruceolsonconstruction.com Owner's Phone Number: 530.559.1262 Name of Person Supervising or Directing Grading: Mark Reed Supervisor's Mailing Address: Post Office Box 1400 Supervisor's City: Capitola Supervisor's State: CA Supervisor's Zip Code: 95010 Supervisor's e-mail Address: mreed@bruceolsonconstruction.com Supervisor's Phone Number: 925.250.4403 Grading Location/Address: 8353 Cutthroat Avenue, Kings Beach, CA 96143 Assessor's Parcel Number (APN): 090-046-005 TRPA Permit or File Number(s): ERSP2012-0916 County Name and Permit Number(s): Placer County PMPM-20120132, 52183.13 If MOU, Attachment B line number: Amount of material to be excavated in Cubic Yards: 20 Total area of disturbance in square feet: 1,200 Destination of excavated material: Eastern Regional Landfill Date work is to begin: currently under construction Date work is to end: 10/25/2013 Detailed Description Of Grading Work To Be Done:The remaining excavation to be completed onsite is for the main driveway and accessible ramp from the existing building to the parking lot. The remainder of the site has been graded and pervious concrete will be poured over the next two weeks and backfilled with clean drain rock. Completing this driveway excavation, grading, and associated pervious concrete will stabilize the site for the winter to ensure water quality through elimination of the possibility for soil erosion. In addition, completion of this work will allow for installation of the required ADA ramp improvements. The completion of the driveway and resulting soil stabilization are critical steps for winterization and the resulting water quality assurance. All temporary BMPs are in place and this work should be completed with full winterization by October 25th.
Assigned to
Ethan Casaday

Associations

Transactions

No development right transactions associated with this record.

Land Capabilities

No parcel land capability records associated with this record.

CAP Documents